Sign In | Join Free | My udpf.com
China Qingdao KXD Steel Structure Co., Ltd logo
Qingdao KXD Steel Structure Co., Ltd
Verified Supplier

1 Years

Home > Metal Construction Building >

Hot Dip Galvanized / Painted Surface Single Storey Prefab Metal Frame Warehouse Hangar Buildings For Fast Installation

Qingdao KXD Steel Structure Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Hot Dip Galvanized / Painted Surface Single Storey Prefab Metal Frame Warehouse Hangar Buildings For Fast Installation

Brand Name : KXD

Model Number : S-0051

Certification : CE, ISO, SGS

Place of Origin : Qingdao, China

MOQ : 500 square meters

Price : US$ 50-80 per square meter

Payment Terms : L/C,T/T

Supply Ability : 3000 tons per month

Delivery Time : 30-40 working days

Packaging Details : bulk for steel panels, steel pallet for steel structure, wooden box for small installing accessories

Dimensions : Customers' Requirement

Door : Sliding door or rolling door

Color : Client's Request

Visit : Workshop Visit And Check Available

Surface : Hot-dip Galvanized / Painted

Frame : Steel structure

Lifetime : over 50 years

Structure Type : High Strength Steel Structure Frame

Prefabrication : Off-site

Installation : Fast

Contact Now

Your Building details confirm to get the design & quotation:

Size

Length × Width × Length

Building Application

its exact usage or special requirements

Roof & Wall material

Steel sheet ? Insulated Panel ? Decorative Panel?

Crane

yes or not? Ton?

Wind Load

wind speed km/h or m/s or mph?

Snow Load

snow weight kg/m2 or snow thickness or Kn/m2?

Door & Window

Sizes? Quantity? Layout?

Inner Layout

Partition room?

More options

Parapet? Skylight? Ventilation? Canopy? Glass wall curtain?

Hot Dip Galvanized / Painted Surface Single Storey Prefab Metal Frame Warehouse Hangar Buildings For Fast Installation

We own more than 20 engineers who have abundant experience for various types buildings. Before design, all requirements will be collected from clients. The design will obey the requirements and pass the calculation check by the architectural soft, such as CAD, PKPM, 3D3S etc.

For the initial planning, we will design the construction blueprint after confirming the clients requirements details. With the check and feedback from the clients, we will make the revise if possible.

After the confirm, we will make further steel structure detailed drawing to prepare the production. This will still be offered to the clients to confirm. Double check will guarantee the building with correct details.

If necessary, finial 3D model will be offered if needed.

Hot Dip Galvanized / Painted Surface Single Storey Prefab Metal Frame Warehouse Hangar Buildings For Fast Installation

Items

Specification

Main steel frame

Column

Q355 Welded H Section Steel (equivalent to S355JR, ASTM A572 Gr. 50)

Beam

Q355 Welded H Section Steel (equivalent to S355JR, ASTM A572 Gr. 50)

Secondary Frame

Purlin

Q235 C and Z purlin (equivalent to S235JR, ASTM A36)

Knee brace

Q235 Angle Steel (equivalent to S235JR, ASTM A36)

Tie Rod

Q235 Circular Steel Pipe (equivalent to S235JR, ASTM A36)

Brace

Q235 Round Bar (equivalent to S235JR, ASTM A36)

Maintenance system

Roof Panel

EPS Sandwich Panel/ Giass Fiber Sandwich Panel/ Rock Wool Sandwich Panel

Wall Panel

Sandwich Panel/ Corrugated Steel Sheet

Accessories

Window

Aluminiumn Alloy Window/ PVC Window/ Sandwich Panel Window

Door

Sliding Sandwich Panel Door/ Rolling Metal Door/ Personal Door

Structure Usage

Up to 50 years

Finishing Options

Vast array of colors and textures available

Hot Dip Galvanized / Painted Surface Single Storey Prefab Metal Frame Warehouse Hangar Buildings For Fast Installation

Processing Steps of Prefabricated Steel Structure Buildings:

Planning and Design

Prefabricated steel buildings starts with a detailed planning and design phase. During this stage, the project’s requirements are identified, and the building’s specifications are established. Factors such as size, layout, and intended usage are considered to ensure that the final design meets the client’s needs. The planning phase also includes obtaining necessary permits and approvals, as local regulations may impact the building’s design.

Fabrication in the workshop

Once the design is finalized, the components are manufactured in a factory. The use of advanced technology in the manufacturing process ensures that the components are of high quality and precisely engineered for quick assembly.

On-Site Assembly

After the prefabricated components are transported to the site, the assembly process begins. Since the parts are pre-engineered, they fit together seamlessly, making the installation process much faster than traditional construction methods. A skilled team of workers assembles the steel frame, attaches the wall panels, and installs the roofing system. Depending on the size and complexity of the building, the assembly process can take anywhere from a few days to a few weeks.

Contact further For Your Project!


Product Tags:

Single Storey Metal Frame Warehouse

      

Painted Surface Metal Frame Warehouse

      

Fast Installation Metal Frame Warehouse

      
Best Hot Dip Galvanized / Painted Surface Single Storey Prefab Metal Frame Warehouse Hangar Buildings For Fast Installation wholesale

Hot Dip Galvanized / Painted Surface Single Storey Prefab Metal Frame Warehouse Hangar Buildings For Fast Installation Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao KXD Steel Structure Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)